 |
Case Study - Project: 1 |
 |
|
 |
Cy Twombly:
Lepanto -Cycle |
|
|
|
| from the Pinakothek der Moderne, Munich - to the Museum of Fine Arts, Houston |
 |
packing
& case design |
 |
logistics
planing
|
 |
inhouse
case production
|
 |
courier
planing
|
 |
agents
management
|
 |
airport
supervision
|
 |
De-/
installation
in Munich
|
 |
customer
response :
positive ( see
email @ bottom of page ) |
|
|
|
|
|
|
The "Lepanto-Cycle"
by artist Cy Twombly needed to be packed and shipped to Houston. In
agreement with the conservators of the Doerner Institute in Munich we provided a
case study for the project. Fully insulated climate controlled slot cases were
built to specification in our carpentry. Packaging and crating was carefully
carried out. The logistics concept included GPS-monitoring of the vehicle on
it's way from Munich to Amsterdam airport, careful palettization at KLM in
Schipohl in cooperation with our colleagues from Van Kralingen, and a safe
arrival of the shipment in Houston. |
| |
|
|
|
|
|
|
Fenster schliessen | close window |